page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27 page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
25
the trashrack at the forebay. For side intakes, the function of
the trashrack is to stop boulders, cobbles, floating logs and
branches from entering the headrace. Coarse trashracks for
side intakes are not designed to exclude gravel and sediment.
This is the job of the gravel trap and the settling basin.
The size of the trashrack should be such that the water velocity
is approximately 0.6 m/s (a lower velocity is uneconomic,
whereas a high velocity tends to attract bedload and debris,
and results in increased headloss).
Since boulders can frequently impact the coarse trashrack, it
needs to be robust, i.e., thick steel sections should be used.
Depending on the length and width of the opening, nature of
the sediment load and the required flow, a clear spacing of
50 mm to 200 mm can be used. The side intake coarse trashrack
of the Galkot Micro-hydro Scheme is shown in Photograph 3.4.
the intake area (i.e., at the riverbank). If it appears that the
intake is at a flood plain or susceptible to damage from
boulders, then the orifice can be located downstream. In
such cases the canal upstream of the orifice and the intake
would be temporary and may require repair after every
monsoon. An orifice is an opening (Figure 3.5) in the intake
from which the river water is conveyed towards the headrace.
The orifice allows the design flow to pass through it under
normal conditions (i.e., low flow) but restricts higher flows
during floods. The discharge through an orifice for
submerged condition is:
i = AC 2g (hr-hh)
V = C 2g (hr-hh)
where:
Q is the discharge through the orifice in m3/s
V is the velocity through the orifice
A is the area of orifice in m2
hr is the water level in the river next to the orifice relative to a
datum.
Figure 3.5 Slide intake
Photo 3.4 Coarse trashrack for 50 kw Galkot MHP, Baglung, Nepal.
65 mm * 10 mm flats at 75 mm centre. ( See Appendix C for the
drawing )
3.5.3 ORIFICE DESIGN
A side intake normally includes an orifice downstream of
the trashrack at the riverbank, through which water is
initially drawn into the headrace. Sometimes, the side
intake is just a continuation of the headrace canal up to the
riverbank. However, as far as practicable, an orifice should
be incorporated to limit excessive flows during floods. With
an intake that is just a continuation of the headrace canal to
the riverbank, excess flow cannot be controlled during floods.
Such excess flow can damage the headrace canal and other
structures downstream. However, the orifice need not be at
hh is the water level in the headrace canal measured from the
same datum as hr.
g is the acceleration due to gravity = 9.8 m/s2
C is the coefficient of discharge of the orifice and is dependent
on the shape of orifice. The value of C decreases with the
amount of turbulence induced by the intake. For a sharp edged
and roughly finished concrete or masonry orifice structure
this value is as low as 0.6 and for carefully finished aperture
it can be up to 0.8.
(hr - hh) will vary according to the discharge in the river since
a higher water level in the river will produce a greater head at
the orifice.
The maximum velocity for a well constructed
concrete/ masonry orifice is 3 m/s: if the velocity exceeds this